TYPICAL CURRENT STATE
Disconnected information.
Production orders, controller programs and QC results are separate and manually checked during item or recipe changes.
TRUSTED FACTORYFLOW
Connect jobs, approved recipes, handshakes and quality outcomes in a traceable production journey.
Controller program execution does not establish that a job uses the work-order recipe. When station settings, parameters or materials change, running/done robot states cannot alone accept output. Engineers need the approved revision, start conditions and the QC result belonging to each run.
Assess a cell with identifiable work orders, managed programs/recipes and defined handover signals. Controllers retain motion authority; field design governs safety and teach/reset authority.
TYPICAL CURRENT STATE
Production orders, controller programs and QC results are separate and manually checked during item or recipe changes.
REFERENCE CONFIGURATION
Cell jobs bind work orders to recipes and program references. Check readiness before execution and keep program completion separate from quality acceptance.
Cell engineer · production supervisor · operator · quality/safety owner
Validate WO-070 and approved recipe R7; compare the controller program under the profile.
Check mode, readiness and handshake before creating JOB-070.
Track job ACK/busy/done and retain native faults if the controller blocks execution.
Bind QC-070 to the job and recipe and return the accepted outcome to the work order.
Each blocker has its own data, authority and resumption conditions.
Block start and have the cell engineer compare revisions, parameters and impact. Do not silently load a different program for urgent work.
Authorized field staff inspect conditions and recovery procedure. Application permissions do not replace controller reset/teach authority.
Keep program outcome distinct from quality failure. Quality owns rework/quarantine; do not automatically report accepted production to MES.
One illustrated journey, not a customer case or live operating session.
Measures to agree for the pilot, not promised improvement levels.
Use consistent start/end milestones and recipe types; separate material waiting from program execution.
QC-accepted jobs / eligible assessed jobs, with explicit rework treatment.
Classify program, material, safety and quality stops rather than label all waiting equipment failure.
Choose a cell, recipe set and specific controller interface. Test program mismatch, missing signals, duplicate jobs and failed QC. Accept the work-order/job/recipe/QC linkage alongside field safety procedures.
Replicate only with cell-specific profiles, run authority and QC criteria. Reassess compatibility and tests after firmware or recipe changes; no universal controller profile.
Discuss stations, existing systems and the measurement period to define the first investment scope.